Episode 7 / 67
In Episode 6, the screens and lights dropped during Vertex Data's final test round, and nobody yet knew why the power failed. Episode 7 of Don't Evict the Wrong Tenant turns the outage into a countdown. Vertex Data's servers have switched to battery backup, and the backup generator has failed to start. About 30 minutes of power remain before the servers go down. A test that stops halfway could force the team to revalidate three months of training work. A manual shutdown is ruled out, since it is too slow and could damage equipment too. Ethan Cole needs the main power back within the half hour. The failed generator makes the blackout look less like bad luck. The question shifts from finishing the test to who can restore the power in time. The battery clock is running, and nobody has found the cause of the failure yet. Whether main power returns before the servers shut down is still unresolved.